Phoenix Contact China, established in Nanjing in 1993, has been growing steadily for 29 years. In 2017, Phoenix Contact China further enhanced the level of intelligent manufacturing and digitalization, and begin the planning of the new generation of intelligent factories. It takes lean, intelligent and green as the concept and builds gradually on the basis of digital industrial planning methods, forming intelligent factories integrating intelligent production, intelligent logistics, intelligent building and energy efficiency management as well as industrial Internet of Things and other core systems. Finally, it realizes all-round integration under the concept of industry 4.0 intelligent factories. The new smart factory (Base II) relocated and started the trial operation in November 2020. So far, it has achieved good economic and social benefits, playing a role of benchmark smart factory in the industry.
菲尼克斯电气中国公司,自1993年落户南京,29年来不断发展壮大。2017年菲尼克斯电气中国公司进一步提升智能制造和数字化的水平,开始新一代智能工厂的规划建设。它以精益、智能、绿色为理念,在数字工业规划方法的基础上逐步构建,形成集智能生产、智能物流、智能楼宇和能效管理以及工业物联等核心系统为一体的智能工厂,最终实现工业4.0智能工厂概念下的全方位整合。该新一代智能工厂于2020年11月开始搬迁和试运营,到目前为止,取得了良好的经济效益和社会效益,发挥着行业标杆智能工厂的作用。
The European Chamber Nanjing is pleased to invite you to visit Phoenix Contact Base II.
欧盟商会南京分会特此邀请您参加菲尼克斯电气新一代智能工厂参观活动!
Agenda:
14:00-14:20 Registration and networking with refreshments 签到与社交时间
14:20-14:20 Opening by General Manager of Nanjing Chapter Ms. You Haiyan 开场致辞,欧盟商会南京分会总经理 游海燕女士
14:20-14:22 Welcome speech by the board member of European Chamber Nanjing Chapter, Phoenix Contact China President Gu Jiandang 欢迎致辞, 欧盟商会南京分会董事会成员、菲尼克斯电气(中国)投资有限公司总裁 顾建党先生
14:22-14:50 Presentation on Digitalization & advanced manufacturing by Vie President Jiang Shimin, 菲尼克斯电气中国数字化工厂及先进制造介绍, 菲尼克斯(中国)投资有限公司供应链管理&数字化副总裁、菲尼克斯亚太物流(南京)有限公司 总经理 江世民先生
14:50-15:05 Q&A Session问答环节
15:05-15:10 Presentation from Nanjing Chapter’s privileged partner The Third Construction Co., Ltd. of China Construction Third Engineering Bureau by Mr Li Yongdong, Project Director 欧盟商会南京分会特约合作伙伴中建三局第三建设工程有限责任公司项目总监厉永东先生进行企业介绍
15:10-15:50 Site tour, lead by Mr Jia Hao, IFC Production Manager 工厂参观, 菲尼克斯亚太电气(南京)有限公司 IFC 生产经理 贾昊先生带领
15:50- 16:00 Group Picture 合影
16:00 End of this event 活动结束
Language语言: Chinese 中文
First come, first served. Members prevails. The Visitor list shall be reviewed by Phoenix Contact before the event date, no competitors allowed. 座位有限先到先得,会员优先。参观名单将由菲尼克斯电气公司审核,竞争者免入。
Payment:
1. Bank transfer:
RMB Bank Account
A/C Name: 中国欧盟商会
A/C No.: 7110210182500027543
China CITIC Bank 中信银行京城大厦支行
Capital Mansion Sub Branch
No. 6, Xinyuan Nan Road
Chaoyang District, 100004 Beijing
北京市朝阳区新源南路6号京城大厦
S.W.I.F.T. Code: CIBKCNBJ100
2. Online pay through Wechat.
Terms & Conditions:
This event has limited seating and requires registration and payment in advance. No walk-ins accepted.
Cancellation Policy:
If you cannot attend this event, please cancel your registration at least 3-working days before. If you fail to notify us of your cancellation in a timely fashion, you will be charged for event costs.
To cancel, please contact Ms. Annie Zhou at azhou@europeanchamber.com.cn.
Disclaimer免责声明:
Participants must maintain proper social distancing norms and abide by the Government ’s Epidemic Prevention and Control Rules. If you do not follow the relevant regulations, the European Union Chamber of Commerce in China accepts no responsibility for any of your physical discomfort caused during and after the event. Thank you for your cooperation.
参与活动时,参会人应与他人保持适当距离(防疫考虑)并遵守政府颁布的疫情预防控制要求(例如佩戴口罩等)。如您违反要求,中国欧盟商会对于您在活动中或者活动后的身体不适,不承担任何责任。 感谢您的理解和配合。